• Hose Loading Stations

Reference List Hose Loading Stations

Project
Station Type
Service
Loading Stataion Details
Location
Contractor
Owner
Year
Adriatic LNG 2 x 2 Reel Hose Loading Station 4" ID Diesel x 50m
3" ID Potable Water x 50m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Dry break weak link couplings
Dry break hose end fittings
Hose string swivels
Zone 1 hazardous area
Adriatic Sea Aker Kvaerner Aker Kvaerner 2006
Moho Bilondo FPSO 2 x 3 reel hose loading stations 6" ID Water x 40m
4" ID Methanol x 40m
4" ID Diesel x 40m
and
2" ID Bilge x 30m
2" ID Sludge x 30m
2" ID Sewage x 30m

Soft Wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Hose string swivels
Zone 1 hazardous area
Messenger Line
Offshore Nigeria Hyundai Total E&P Congo 2006
Akpo FPSO 1 off 5 reel hose loading station 6" ID Diesel x 50m
6" ID Fresh Water x 50
3" ID Chemical Product x 50m (Hard Wall Hose)
2" ID Sewage x 50m
2" ID Bilge and Sludge x 50m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Hose string swivels
Zone 2 hazardous area
Messenger Line
Offshore Nigeria Hyundai Total Upstream Nigeria 2006
Confidential 1 off 4 reel on a skid base 4" ID Diesel x 50m
4" ID Waste Oil/Water x 50m
3" ID Oil/Salt Water/Slime x 50m
2" ID Drinking Water x 50m

Soft wall hose (10bar)
Wander lead control station
Electro/hydraulic power unit
Dry break weak link couplings
Dry break hose end fittings
Zone 2 Hazardous area
Low temperature operation (ambient temp -20°C)
Barents Sea, Russia JHK Anlagenbau und Service GmbH Confidential 2006
Kvitebjorn EPCH Platform 1 off single reel 4" ID H2S Scavenger x 80m

Hard wall hose (10bar)
Wander-lead control station
Comnnection to existing Electro/hydraulic power unit
Dry break weak link couplings
Dry break hose end fittings
Norwegian Sector of North Sea Vetco Aibel Statoil 2006
MSV Regalia 1 off single reel 4" ID Diesel Oil x 60m

Soft wall hose (10bar)
Wander-lead control station
Hydraulic control unit
Dry break weak link couplings
Dry break hose end fittings
  Prosafe Offshore Limited Confidential 2006
Prirazlomnoye Platform 2 off 5 reel on a skid base 5" ID Diesel x 50m
5" ID Mud/Brine/Waste Water x 50m
4" ID Drinking Water x 50m
5" ID Barite/Bentonite x 50m
5" ID Cement x 50m

Soft wall hose (10bar)
Wander lead control station
Electro/hydraulic power unit
Dry break weak link couplings
Dry break hose end fittings
Non hazardous area
Low temperature operation (ambient temp -20°C)
Barents Sea, Russia JHK Anlagenbau und Service GmbH Confidential 2006
Petrobras P54 FPSO 2 off 2 reel on a skid base 4" ID Diesel x 120m
4" ID Potable Water x 120m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Hose string swivels
Zone 2 hazardous area
Campos Basin, East Coast of Brazil Jurong Shipyard Petrobras 2005
Petrobras PRA-1 2 off 2 reel on a skid base 4" ID Diesel x 120m
4" ID Potable Water x 120m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Hose string swivels
Non hazardous area
Campos Basin, East Coast of Brazil Odebrecht Petrobras 2005
Petrobras P16 Platform 1 off 5 reel on a skid base as previous contract 3" ID Diesel x 60m
4" ID Potable Water x 60m
4" ID Liquid Mud x 60m
4" ID Powder Service x 60m
4" ID Powder Service x 60m

Soft wall hose (upto 16bar)
Wander lead control station
Electro/hydraulic power unit
Dry break weak link couplings
Dry break hose end fittings
Non hazardous area
Campos Basin, East Coast of Brazil Petrobras America Petrobras 2005
Marathon Alvheim FPSO conversion 1 off 2 reel on a skid base 4" ID Diesel x 60m
4" ID Fresh Water x 60m
Wander-lead control station
Hydraulic control manifold
Dry break weak link couplings
Dry break hose end fittings
Hose string swivels
Zone 2 hazardous area
Norwegian Sector of North Sea Keppel Shipyard Marathon 2005
Sakhalin 1 Platform (Orlan) 2 off 7 reel enclosed and heated hose loading stations for operating in ambient temperatures of -44°C 4" ID Drill Water x 60m
4" ID Fuel Oil 60m
4" ID Base Oil x 60m
4" ID Water Base Mud x 60m
4" Oil Base Mud x 60m
5" Bulk Cement x 60m
5" Barite Bentonite x 60m

Soft wall hose (16bar)
Heated enclosure – internal access
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 1 hazardous area
Sakhalin Island, South Coast of Russia Tri Ocean Exxon Mobil 2005
Sakhalin 2 Platform (LUN-A) 2 off 5 reel enclosed and heated hose loading stations for operating in ambient temperatures of -44°C 4" ID Fuel Oil x 60m
4" ID Drilling Mud x 60m
4" ID Spare Fluid x 60m
5" Bulk Cement x 60m
5" Barite Bentonite x 60m

Soft wall hose (16bar)
Heated enclosure – internal access
Wander-lead control
Enclosed control cabin
Electro/hydraulic power unit
Electric starter control panel
100% power redundancy
Dry break weak link couplings
Dry break hose end fittings
Zone I hazardous area
Sakhalin Island, South Coast of Russia Amec Sakhalin Energy Investment Co 2005
Sakhalin 2 Platform (PA-B) 2 off 6 reel enclosed and heated hose loading stations for operating in ambient temperatures of -44°C 4" ID Base Oil x 60m
4" ID Fuel Oil x 60m
4" ID Drilling Mud x 60m
4" ID Spare Fluid x 60m
5" Bulk Cement x 60m
5" Barite Bentonite x 60m

Soft wall hose (16bar)
Heated enclosure – internal access
Wander-lead control
Enclosed control cabin
Electro/hydraulic power unit
Electric starter control panel
100% power redundancy
Dry break weak link couplings
Dry break hose end fittings
Zone I hazardous area
Sakhalin Island, South Coast of Russia Amec Sakhalin Energy Investment Co 2005
Greater Plutonio Block 18 FPSO 1 off 3 reel on a skid base 4" ID Diesel Oil x 80m
4" ID Potable Water x 80m
4" ID Methanol

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
East Africa, Angola Halliburton BP 2005
Petrobras P16 Platform 1 off 5 reel on a skid base 3" ID Diesel x 60m
4" ID Potable Water x 60m
4" ID Liquid Mud x 60m
4" ID Powder Service x 60m
4" ID Powder Service x 60m

Soft wall hose (upto 16bar)
Wander lead control station
Electro/hydraulic power unit
Dry break weak link couplings
Dry break hose end fittings
Non hazardous area
Campos Basin, East Coast of Brazil Petrobras America Petrobras 2004
Magnolia Platform 2 off 3 reel station on skid base and 2 off platform bulk transfer hose STATION
4" ID Diesel Oil x 65m
4" ID Drill Water x 65m

Soft wall hose (10bar)

BULK TRANSFER HOSE
4" ID Mud x 65m
4" ID Brine x 65m
5" ID Cement x 65m
5" ID Barite x 65m
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Gulf of Mexico Alliance Engineering Conoco Philips 2004
Buzzard Platform 1 off 5 reel on a skid base 4" ID Drill Water x 70m
4" ID Water Based Mud x 70m
4" ID Oil Based Mud x 70m
4" ID Spare Fluid x 70m
4" ID Spare Fluid x 70m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
UK Sector of North Sea CB&I John Brown Encana 2004
Buzzard Platform 1 off 2 reel on a skid base 4" ID Diesel Oil x 70m
4" ID Fresh Water x 70m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
UK Sector of North Sea CB&I John Brown Encana 2004
Dalia FPSO 1 off single reel 6" ID Diesel Oil x 60m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
East Africa, Angola Samsung Mobil 2004
Petrobras P50 FPSO 2 off 2 reel on a skid base 4" ID Diesel x 120m
4" ID Potable Water x 120m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Hose string swivels
Zone 2 hazardous area
Campos Basin, East Coast of Brazil Jurong Shipyard Petrobras 2003
Kristen EPCH Platform 1 off 5 reel on a skid base 4" ID Diesel Oil x 70m
4" ID Potable Water x 70m
4" ID Methanol x 70m
4" ID H2S Scavenger x 70m
4" ID Spare Service x 70m

Soft wall hose (10bar)
Wander lead control station
Platform hydraulic ring main
Stainless steel drums
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Norwegian Sector of North Sea Aker Kvaerner Statoil 2002
Petrobras P43 FPSO (Barracuda) 2 off 2 reel on a skid base 4" ID Diesel x 120m
4" ID Potable Water x 120m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break and weak link couplings
Dry break hose end fittings
Hose string swivels
Zone 2 hazardous area
Campos Basin, East Coast of Brazil Halliburton Petrobras 2001
Petrobras P43 FPSO (Caratinga) 2 off 2 reel on a skid base 4" ID Diesel x 120m
4" ID Potable Water x 120m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break and weak link couplings
Dry break hose end fittings
Hose string swivels
Zone 2 hazardous area
Campos Basin, East Coast of Brazil Halliburton Petrobras 2001
Kvitebjorn EPCH Platform 1 off 7 reel on a skid base 4" ID Diesel x 70m
4" ID Potable Water x 70m
4" ID MEG x 70m
4" ID Completion Fluid x 70m
4" ID Base Oil x 70m
5" ID Bulk Cement x 70m
5" ID Bulk Barite x 70m

Soft wall hose (10bar)
Wander lead control station
Stainless steel drums
Electro/hydraulic power unit
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Norwegian Sector of North Sea ABB Statoil 2001
Ringhorne Platform 2 off 6 reel on a skid base 4" ID Diesel x 60m
4" ID Potable Water x 60m
4" ID Brine x 60m
4" ID Base Oil x 60m
5" ID Bulk Cement x 60m
5" ID Bulk Barite x 60m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Norwegian Sector of North Sea Heerema Drilling Alliance Statoil 2001
Huldra EPC Wellhead 2 off 4 reel on a skid base 4" ID Diesel Oil x 70m
4" ID Potable Water x 70m
4" ID MEG x 70m
4" ID H2S Scavenger x 70m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Norwegian Sector of North Sea Aker Kvaerner Statoil 2001
Navis Explorer (Drill Ship) 8 off Individual hydraulically driven hose reels (2 off each medium) 4" ID Drill Water x 40m
4" ID Brine/Completion x 40m
4" ID Fresh Water x 40m
4" ID Diesel Oil x 40m

Soft wall hose (10bar)
Individual fixed control stations
Hydraulic ring main (vessel supply)
Dry break and weak link couplings
Dry break hose end fittings
Non hazardous area
Campos Basin, East Coast of Brazil   Petrobras 1999
Snorre B Platform 2 off 8 reel on a skid base 4" ID Diesel x 70m
4" ID Potable Water x 70m
4" ID Methanol x 70m
4" ID Brine / Completion x 70m
4" ID Base Oil x 70m
4" ID Mud x 70m
5" ID Bulk Cement x 70m
5" ID Bulk Barite x 70m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Norwegian Sector of North Sea Aker Kvaerner Saga Petroleum 1999
Jotun Field Development 2 off 8 reel on a skid base 4" ID Diesel x 70m
4" ID Potable Water x 70m
4" ID Methanol x 70m
4" ID Brine / Completion x 70m
4" ID Base Oil x 70m
4" ID Mud x 70m
5" ID Bulk Cement x 70m
5" ID Bulk Barite x 70m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Norwegian Sector of North Sea ABB Esso 1999
Asgard Platform 9 off Individual hydraulically driven hose reels 4" ID Methanol x 50m (2 off)
4" ID Fuel Oil x 50m (2 off)
3" ID MEG x 50m (2 off)
4" ID Fresh Water x 50m (2 off)
2" ID Sludge x 50m (1 off)

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Norwegian Sector of North Sea Aker Statoil 1999
Neptune Platform 1 off single reel 4" ID Diesel Oil x 60m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
UK Sector of North Sea Brown & Root British Gas 1999
Terra Nova FPSO 1 off 2 reel on a skid base 4" ID Diesel Oil x 60m
4" ID Fresh Water x 60m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Grand Banks of Newfoundland Brown & Root Petro Canada Terra Nova Alliance 1999
Oseberg SOR Platform 2 off 8 reel on a skid base 4" ID Diesel x 80m
4" ID Potable Water x 80m
4" ID Methanol x 80m
4" ID Base Fluid x 80m
4" ID Base Oil x 80m
4" ID Liquid Mud x 80m
5" ID Bulk Cement x 80m
5" ID Bulk Barite x 80m

Soft wall hose (10bar)
Wander-lead control station
Electro/hydraulic power unit
Electric starter control panel
Dry break weak link couplings
Dry break hose end fittings
Zone 2 hazardous area
Norwegian Sector of North Sea Aker Maritime Norske Hydro 1998