Reference List Hose Loading Stations
Project |
Station Type |
Service |
Loading Stataion Details |
Location |
Contractor |
Owner |
Year |
| Adriatic LNG | 2 x 2 Reel Hose Loading Station | 4" ID Diesel x 50m 3" ID Potable Water x 50m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Dry break weak link couplings Dry break hose end fittings Hose string swivels Zone 1 hazardous area |
Adriatic Sea | Aker Kvaerner | Aker Kvaerner | 2006 |
| Moho Bilondo FPSO | 2 x 3 reel hose loading stations | 6" ID Water x 40m 4" ID Methanol x 40m 4" ID Diesel x 40m and 2" ID Bilge x 30m 2" ID Sludge x 30m 2" ID Sewage x 30m Soft Wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Hose string swivels Zone 1 hazardous area Messenger Line |
Offshore Nigeria | Hyundai | Total E&P Congo | 2006 |
| Akpo FPSO | 1 off 5 reel hose loading station | 6" ID Diesel x 50m 6" ID Fresh Water x 50 3" ID Chemical Product x 50m (Hard Wall Hose) 2" ID Sewage x 50m 2" ID Bilge and Sludge x 50m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Hose string swivels Zone 2 hazardous area Messenger Line |
Offshore Nigeria | Hyundai | Total Upstream Nigeria | 2006 |
| Confidential | 1 off 4 reel on a skid base | 4" ID Diesel x 50m 4" ID Waste Oil/Water x 50m 3" ID Oil/Salt Water/Slime x 50m 2" ID Drinking Water x 50m Soft wall hose (10bar) |
Wander lead control station Electro/hydraulic power unit Dry break weak link couplings Dry break hose end fittings Zone 2 Hazardous area Low temperature operation (ambient temp -20°C) |
Barents Sea, Russia | JHK Anlagenbau und Service GmbH | Confidential | 2006 |
| Kvitebjorn EPCH Platform | 1 off single reel | 4" ID H2S Scavenger x 80m Hard wall hose (10bar) |
Wander-lead control station Comnnection to existing Electro/hydraulic power unit Dry break weak link couplings Dry break hose end fittings |
Norwegian Sector of North Sea | Vetco Aibel | Statoil | 2006 |
| MSV Regalia | 1 off single reel | 4" ID Diesel Oil x 60m Soft wall hose (10bar) |
Wander-lead control station Hydraulic control unit Dry break weak link couplings Dry break hose end fittings |
Prosafe Offshore Limited | Confidential | 2006 | |
| Prirazlomnoye Platform | 2 off 5 reel on a skid base | 5" ID Diesel x 50m 5" ID Mud/Brine/Waste Water x 50m 4" ID Drinking Water x 50m 5" ID Barite/Bentonite x 50m 5" ID Cement x 50m Soft wall hose (10bar) |
Wander lead control station Electro/hydraulic power unit Dry break weak link couplings Dry break hose end fittings Non hazardous area Low temperature operation (ambient temp -20°C) |
Barents Sea, Russia | JHK Anlagenbau und Service GmbH | Confidential | 2006 |
| Petrobras P54 FPSO | 2 off 2 reel on a skid base | 4" ID Diesel x 120m 4" ID Potable Water x 120m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Hose string swivels Zone 2 hazardous area |
Campos Basin, East Coast of Brazil | Jurong Shipyard | Petrobras | 2005 |
| Petrobras PRA-1 | 2 off 2 reel on a skid base | 4" ID Diesel x 120m 4" ID Potable Water x 120m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Hose string swivels Non hazardous area |
Campos Basin, East Coast of Brazil | Odebrecht | Petrobras | 2005 |
| Petrobras P16 Platform | 1 off 5 reel on a skid base as previous contract | 3" ID Diesel x 60m 4" ID Potable Water x 60m 4" ID Liquid Mud x 60m 4" ID Powder Service x 60m 4" ID Powder Service x 60m Soft wall hose (upto 16bar) |
Wander lead control station Electro/hydraulic power unit Dry break weak link couplings Dry break hose end fittings Non hazardous area |
Campos Basin, East Coast of Brazil | Petrobras America | Petrobras | 2005 |
| Marathon Alvheim FPSO conversion | 1 off 2 reel on a skid base | 4" ID Diesel x 60m 4" ID Fresh Water x 60m |
Wander-lead control station Hydraulic control manifold Dry break weak link couplings Dry break hose end fittings Hose string swivels Zone 2 hazardous area |
Norwegian Sector of North Sea | Keppel Shipyard | Marathon | 2005 |
| Sakhalin 1 Platform (Orlan) | 2 off 7 reel enclosed and heated hose loading stations for operating in ambient temperatures of -44°C | 4" ID Drill Water x 60m 4" ID Fuel Oil 60m 4" ID Base Oil x 60m 4" ID Water Base Mud x 60m 4" Oil Base Mud x 60m 5" Bulk Cement x 60m 5" Barite Bentonite x 60m Soft wall hose (16bar) |
Heated enclosure – internal access Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 1 hazardous area |
Sakhalin Island, South Coast of Russia | Tri Ocean | Exxon Mobil | 2005 |
| Sakhalin 2 Platform (LUN-A) | 2 off 5 reel enclosed and heated hose loading stations for operating in ambient temperatures of -44°C | 4" ID Fuel Oil x 60m 4" ID Drilling Mud x 60m 4" ID Spare Fluid x 60m 5" Bulk Cement x 60m 5" Barite Bentonite x 60m Soft wall hose (16bar) |
Heated enclosure – internal access Wander-lead control Enclosed control cabin Electro/hydraulic power unit Electric starter control panel 100% power redundancy Dry break weak link couplings Dry break hose end fittings Zone I hazardous area |
Sakhalin Island, South Coast of Russia | Amec | Sakhalin Energy Investment Co | 2005 |
| Sakhalin 2 Platform (PA-B) | 2 off 6 reel enclosed and heated hose loading stations for operating in ambient temperatures of -44°C | 4" ID Base Oil x 60m 4" ID Fuel Oil x 60m 4" ID Drilling Mud x 60m 4" ID Spare Fluid x 60m 5" Bulk Cement x 60m 5" Barite Bentonite x 60m Soft wall hose (16bar) |
Heated enclosure – internal access Wander-lead control Enclosed control cabin Electro/hydraulic power unit Electric starter control panel 100% power redundancy Dry break weak link couplings Dry break hose end fittings Zone I hazardous area |
Sakhalin Island, South Coast of Russia | Amec | Sakhalin Energy Investment Co | 2005 |
| Greater Plutonio Block 18 FPSO | 1 off 3 reel on a skid base | 4" ID Diesel Oil x 80m 4" ID Potable Water x 80m 4" ID Methanol Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
East Africa, Angola | Halliburton | BP | 2005 |
| Petrobras P16 Platform | 1 off 5 reel on a skid base | 3" ID Diesel x 60m 4" ID Potable Water x 60m 4" ID Liquid Mud x 60m 4" ID Powder Service x 60m 4" ID Powder Service x 60m Soft wall hose (upto 16bar) |
Wander lead control station Electro/hydraulic power unit Dry break weak link couplings Dry break hose end fittings Non hazardous area |
Campos Basin, East Coast of Brazil | Petrobras America | Petrobras | 2004 |
| Magnolia Platform | 2 off 3 reel station on skid base and 2 off platform bulk transfer hose | STATION 4" ID Diesel Oil x 65m 4" ID Drill Water x 65m Soft wall hose (10bar) BULK TRANSFER HOSE 4" ID Mud x 65m 4" ID Brine x 65m 5" ID Cement x 65m 5" ID Barite x 65m |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Gulf of Mexico | Alliance Engineering | Conoco Philips | 2004 |
| Buzzard Platform | 1 off 5 reel on a skid base | 4" ID Drill Water x 70m 4" ID Water Based Mud x 70m 4" ID Oil Based Mud x 70m 4" ID Spare Fluid x 70m 4" ID Spare Fluid x 70m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
UK Sector of North Sea | CB&I John Brown | Encana | 2004 |
| Buzzard Platform | 1 off 2 reel on a skid base | 4" ID Diesel Oil x 70m 4" ID Fresh Water x 70m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
UK Sector of North Sea | CB&I John Brown | Encana | 2004 |
| Dalia FPSO | 1 off single reel | 6" ID Diesel Oil x 60m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
East Africa, Angola | Samsung | Mobil | 2004 |
| Petrobras P50 FPSO | 2 off 2 reel on a skid base | 4" ID Diesel x 120m 4" ID Potable Water x 120m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Hose string swivels Zone 2 hazardous area |
Campos Basin, East Coast of Brazil | Jurong Shipyard | Petrobras | 2003 |
| Kristen EPCH Platform | 1 off 5 reel on a skid base | 4" ID Diesel Oil x 70m 4" ID Potable Water x 70m 4" ID Methanol x 70m 4" ID H2S Scavenger x 70m 4" ID Spare Service x 70m Soft wall hose (10bar) |
Wander lead control station Platform hydraulic ring main Stainless steel drums Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Norwegian Sector of North Sea | Aker Kvaerner | Statoil | 2002 |
| Petrobras P43 FPSO (Barracuda) | 2 off 2 reel on a skid base | 4" ID Diesel x 120m 4" ID Potable Water x 120m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break and weak link couplings Dry break hose end fittings Hose string swivels Zone 2 hazardous area |
Campos Basin, East Coast of Brazil | Halliburton | Petrobras | 2001 |
| Petrobras P43 FPSO (Caratinga) | 2 off 2 reel on a skid base | 4" ID Diesel x 120m 4" ID Potable Water x 120m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break and weak link couplings Dry break hose end fittings Hose string swivels Zone 2 hazardous area |
Campos Basin, East Coast of Brazil | Halliburton | Petrobras | 2001 |
| Kvitebjorn EPCH Platform | 1 off 7 reel on a skid base | 4" ID Diesel x 70m 4" ID Potable Water x 70m 4" ID MEG x 70m 4" ID Completion Fluid x 70m 4" ID Base Oil x 70m 5" ID Bulk Cement x 70m 5" ID Bulk Barite x 70m Soft wall hose (10bar) |
Wander lead control station Stainless steel drums Electro/hydraulic power unit Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Norwegian Sector of North Sea | ABB | Statoil | 2001 |
| Ringhorne Platform | 2 off 6 reel on a skid base | 4" ID Diesel x 60m 4" ID Potable Water x 60m 4" ID Brine x 60m 4" ID Base Oil x 60m 5" ID Bulk Cement x 60m 5" ID Bulk Barite x 60m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Norwegian Sector of North Sea | Heerema Drilling Alliance | Statoil | 2001 |
| Huldra EPC Wellhead | 2 off 4 reel on a skid base | 4" ID Diesel Oil x 70m 4" ID Potable Water x 70m 4" ID MEG x 70m 4" ID H2S Scavenger x 70m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Norwegian Sector of North Sea | Aker Kvaerner | Statoil | 2001 |
| Navis Explorer (Drill Ship) | 8 off Individual hydraulically driven hose reels (2 off each medium) | 4" ID Drill Water x 40m 4" ID Brine/Completion x 40m 4" ID Fresh Water x 40m 4" ID Diesel Oil x 40m Soft wall hose (10bar) |
Individual fixed control stations Hydraulic ring main (vessel supply) Dry break and weak link couplings Dry break hose end fittings Non hazardous area |
Campos Basin, East Coast of Brazil | Petrobras | 1999 | |
| Snorre B Platform | 2 off 8 reel on a skid base | 4" ID Diesel x 70m 4" ID Potable Water x 70m 4" ID Methanol x 70m 4" ID Brine / Completion x 70m 4" ID Base Oil x 70m 4" ID Mud x 70m 5" ID Bulk Cement x 70m 5" ID Bulk Barite x 70m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Norwegian Sector of North Sea | Aker Kvaerner | Saga Petroleum | 1999 |
| Jotun Field Development | 2 off 8 reel on a skid base | 4" ID Diesel x 70m 4" ID Potable Water x 70m 4" ID Methanol x 70m 4" ID Brine / Completion x 70m 4" ID Base Oil x 70m 4" ID Mud x 70m 5" ID Bulk Cement x 70m 5" ID Bulk Barite x 70m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Norwegian Sector of North Sea | ABB | Esso | 1999 |
| Asgard Platform | 9 off Individual hydraulically driven hose reels | 4" ID Methanol x 50m (2 off) 4" ID Fuel Oil x 50m (2 off) 3" ID MEG x 50m (2 off) 4" ID Fresh Water x 50m (2 off) 2" ID Sludge x 50m (1 off) Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Norwegian Sector of North Sea | Aker | Statoil | 1999 |
| Neptune Platform | 1 off single reel | 4" ID Diesel Oil x 60m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
UK Sector of North Sea | Brown & Root | British Gas | 1999 |
| Terra Nova FPSO | 1 off 2 reel on a skid base | 4" ID Diesel Oil x 60m 4" ID Fresh Water x 60m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Grand Banks of Newfoundland | Brown & Root Petro Canada | Terra Nova Alliance | 1999 |
| Oseberg SOR Platform | 2 off 8 reel on a skid base | 4" ID Diesel x 80m 4" ID Potable Water x 80m 4" ID Methanol x 80m 4" ID Base Fluid x 80m 4" ID Base Oil x 80m 4" ID Liquid Mud x 80m 5" ID Bulk Cement x 80m 5" ID Bulk Barite x 80m Soft wall hose (10bar) |
Wander-lead control station Electro/hydraulic power unit Electric starter control panel Dry break weak link couplings Dry break hose end fittings Zone 2 hazardous area |
Norwegian Sector of North Sea | Aker Maritime | Norske Hydro | 1998 |
